Register of Building Applications

Go Search
Register
Airport Map
  

Register of Building Applications.

Information about application for building activities at Perth Airport.

Background

Land use planning and building control at Perth Airport is regulated by the Airports Act 1996 (Act). This means that State law does not apply and all building approvals for building activity on Perth Airport land are issued under Commonwealth law.

Regulations have been made pursuant to the Act, and the regulations dealing with the approval of building activities (as defined in the Act) are the Airports (Building Control) Regulations 1996. The Regulations set out the way in which applications are made for approval of building activities, as well as the matters the Airport Building Controller (ABC) considers applications before an approval is issued.

Before building activity is commenced on Perth Airport land, a permit under the provisions of the Airports Act 1996 and Airports (Building Control) Regulations 1996 must be obtained from the Airport Building Controller.

A building activity is defined as:-
  1. Construction of buildings or other structure;
  2. Alterations to the structure of buildings or other structures;
  3. Constructing or altering earthworks (whether or not in relation to a buildings etc.)
  4. Constructing or altering engineering, electrical or hydraulic works;
  5. Demolishing , destroying, dismantling or removing: - Building, structure, earthworks, engineering works, electrical works and hydraulic works.

Structures include bridges, fences, towers, pylons and temporary structures such as tents.

Earth work or engineering works include runways, taxiways, aprons, roads, car parks, retaining walls, dams, railways pipelines, road surfaces, car park surfaces and tunnels.

The approval process also involves obtaining the consent of the Airport Lessee Company (ALC) which is Westralia Airports Corporation (WAC).

The Regulations describe the things Perth Airport must be satisfied about before it gives its consent, such as whether the proposed building activity is consistent with the Perth Airport Master Plan.

Information published on this website

As of 27 March 2010 the Regulations require certain information about building applications at Perth Airport to be published by the ALC on the Perth Airport website. Accordingly, this information is published by WAC in accordance with the requirements of the Regulations.

Note: The “Date of Application” is the date that the ALC received the application from the ABC if the applicant is not the ALC and is the date the application was submitted to the ABC if the applicant is the ALC.

DescriptionFilter
Perth Inflight Catering
Internal renovations to create a wash room
14/05/2012General AviationG5In Progress
Airservices Australia
Upgrade the Runway 03 & Runway 21 Localiser antenna array; and Construction of Distance Measuring Equipment (DME) antenna at Runway 21 and Runway 24 Glide path sites
11/05/2012numerous locationsI5, J8, L9 & F22In Progress
APP for PAPL
Install 400sq. mm AI HV ring main section between Falcon Substation, Fauntleroy Substation, Cabin Services Substation and Kendall switch-room. 24 core fibre optic cable to be co-trenched.
11/05/2012AirsideH6 to H16 & I16In Progress
Aurecon for PAPL
Investigation for Skippers & Cobham parking
10/05/2012GA airsideF6 & G6In Progress
Bruce Arnold - AsA
install upgraded lightning protection system and replace radar equipment
9/05/2012N4In Progress
Diversified Services
Upgrade existing pits to manholes and installation of communication conduits and haul optical fibre cable
8/05/2012International Precinct24I, 24J, 25I, 25J & 15K  In Progress
APP for PAPL
Installation of a new High Pressure Gas connection and regulator equipment to the New Domestic Terminal Co-Gen building.  Installation to run adjacent to existing MP gas main
8/05/2012International Precinct13K, 14K, 15KIn Progress
Nick Forostenko
Construction of a deconstruction room at Customs on Fricker Road
7/05/2012Internation Precinct 15LIn Progress
City of Belmont
Installation of a 100mm thick footpath 2.5m wide and 30m long
3/05/2012Domestic Precinct9CIn Progress
APP for PAPL
Installation of new primary ring mains, replacement of existing distribution ring mains units, replacement of existing transformer and low voltage distribution board and new earthing at Cabin services
3/05/2012Domestic7E & 6FIn Progress
QANTAS
Installation of a 100mm panel constructed modular wash complex
2/05/2012International Precinct14MIn Progress
PAPL
Road safety improvements to the PAPL road networks including lighting, signs & kerbing
27/04/2012Numerous locationsNumerous locationsIn Progress
APN Outdoor
Gantry - Current panels to be removed, reinstated and digital screens in stalled
Light boxes - 2 x light boxes to be installed at forecourt
20/04/2012Domestic Precinct9D & 9FIn Progress
APN Outdoor
New advertising light boxes to be attached to existing infrastructure behind the walls.
Digital advertising screens to be installed/bolted to the floor
19/04/2012Domestic and InternationalF9 & K12In Progress
Perth Mint - Graeme Martin
Single level concrete tilt panel building with metal roof surrounded by cyclone mesh fence
19/04/2012Precinct 2I21In Progress
Fairlandview Investments Pty Ltd
Construction of a warehouse and office facility. Concrete floor, tilt up concrete walls
10/04/2012Precinct 32TIn Progress
PAPL
Construction of asphalt pavement for aircraft parking with associated infrastructure
5/04/2012Airside7G & 7HIn Progress
Dave Bolton DAFF
Haul through existing conduits to pit outside IP&MP office and excavation and new conduits into AQIS.
2/04/2012International 15KGranted16/05/2012In Progress
APP for PAPL
Provide an additional 329 parking bays next to Rio Tinto
1/04/2012Precinct 19DGranted30/04/2012Approved1/05/2012Complete
PAPL
pavement extension to Taxiway Romeo apron
30/03/2012Airside4H & 5HGranted2/05/2012Approved7/05/2012Complete
PAPL
Installation of a patio at the IP&MP office
30/03/2012Domestic Precinct15KGranted24/04/2012Approved2/05/2012Complete
Wayne Frusher - Qantas
Steel framed hardstands to accomodate refrigeration units
22/03/2012International PrecinctM14In Progress
Gary Cox
Soil sampling at 4 locations
16/03/2012Domestic E8Granted4/04/2012Approved5/04/2012Complete
Neil Hawkins - MacMahon
Internal office alterations and additions
13/03/2012Precinct 417O & 17PGranted13/04/2012Approved14/05/2012Complete
KMC Group
Removal of existing underground storage tanks at T1 & T3 and surface remedial tanks
12/03/2012International & Domestic terminalsL12 & G8Granted4/04/2012Approved13/04/2012Complete
Environmental Strategies
Installation of a groundwater moitoring bore to the north of the Perth Mint Refinery
12/03/2012Precinct 2I21Granted18/04/2012Approved26/04/2012Complete
Bernard Speldewinde
Traffic / ticket office fitout
29/02/2012International terminalK12Granted4/04/2012Approved19/04/2012Complete
Qantas
Provide temporary equipment office & executive office at 41 Affleck Road
28/02/2012International Precinct14MIn Progress
Telstra
Installation of conduits, pit and communications for 9 Dawson Road
20/02/2012International PrecinctL14Granted16/03/2012Approved19/03/2012Complete
PAPL
T1 Lvl 1 Screening point upgrades / renovations to facilitate new screening equipment
16/02/2012International K12Granted10/05/2012In Progress
Point Project Management
demolition of existing car rental booths and replace with new booths
15/02/2012DomesticF9Granted16/03/2012Approved19/03/2012Complete
PAPL
baggage reclaim, primary line and duty free
10/02/2012Internation Terminal 12LGranted18/04/2012Approved14/05/2012Complete
Airservices Australia
Installation of A-SMGCS equipment
8/02/2012numerous locationsNumerous locations Granted18/04/2012Approved3/05/2012Complete
Bob Sykes
Closure of GWD by creating a Cul-de-sac
1/02/2012Precinct 18d & 9DGranted16/03/2012Approved1/05/2012Complete
Nathan Freeman
De-fit of existing tenancy and fit-out for new tenancy
29/01/2012Terminal 2F9Granted26/02/2012Approved9/03/2012Complete
Trevor Pilbeam - SGS
provide a limestone base car park
25/01/2012Precinct 2A24HIn Progress
Morgan Siter
Asphalt car wash bay and yard extension
19/01/2012Precinct 3AE10Granted23/04/2012Approved2/05/2012Complete
LS Travel Retail Pacific
Relocation of counter and fridges and construct wall bays and walls to reflect
16/01/2012International TerminalK12Granted28/02/2012Approved6/03/2012Complete
Sanjeewa Ratnayaka
Relocation of existing services and forward works for new services from Co Gen to T1 Arrivals and pressuring fire ring main
13/01/2012Terminal 112KGranted16/02/2012Approved20/02/2012Complete
Bill Sherrington
Small Talk Cafe Temporary lunch shop
6/01/2012Precinct 1C6EGranted6/02/2012Approved16/02/2012Complete
Neil Hawkins MacMahon
MacMahon Brick paving
4/01/2012Precinct 420OGranted25/01/2012Approved27/01/2012Complete
L Buckeridge
Removal of asphalt in SE corner excluding the DBNGP
29/12/2011Precinct 35SGranted27/04/2012Approved10/05/2012Complete
Nigel Martin
Internal renovation to create office space
21/12/2011General Aviation5GGranted25/01/2012Approved31/01/2012Complete
Perth Airport
Construction of switchroom and procurement/installation of electrical HV Switch gear
20/12/2011International Precinct16JIn Progress
Sid Moore - Toll Express
Construction of Hardstand including drainage, kerbing, signs, line-marking and lighting
19/12/2011International Precinct18K & 18LGranted22/04/2012Approved1/05/2012In Progress
John Braithwaite
Munday Substation: Remedial works
14/12/2011International Precinct22m & 22NGranted12/03/2012Approved8/05/2012Complete
Len Buckeridge
Construction of limestone wall along Kalamunda Road
14/12/2011Precinct 35RGranted19/01/2012Approved24/01/2012Complete
Len Buckeridge
BGC: removal of asphalt over DBNGP easement in SE corner
14/12/2011Precinct 35SGranted26/04/2012In Progress
Brendon Sadler
Installation of light box signage
13/12/2011General Aviation7EGranted11/01/2012Approved24/02/2012Complete
Adrian Pietropaolo
T1 Departures - Rip Curl & Purely Australian de-fit to concourse
7/12/2011International TerminalK12Granted4/01/2012Approved9/01/2012Complete
Don Bridges - Perth Airport
asphalt pavement for aircraft parking
30/11/2011Airside5HGranted7/12/2011Approved7/12/2011Complete
Don Bridges
Construction of concrete and asphalt apron with associated lighting and drainage works
30/11/2011International12J & 12KGranted12/01/2012Approved19/01/2012Complete
Len Buckeridge
asphalt to south east corner
30/11/2011Precinct 3A4R, 5R & 5SIn Progress
Perth Airport
Relocation of taxi rank, bus bays & car rental facilities
29/11/2011International Precinct12L, 13L & 14LGranted26/02/2012Approved27/02/2012Complete
Graeme Martin - Perth Mint
Concrete and Steel Storage Facility
22/11/2011Precinct 2B21IGranted1/05/2012In Progress
Perth Airport
TWA: Additional airline lounges
21/11/2011Sugarbird Lady Road14J & 14KGranted19/12/2011Approved6/03/2012Complete
Perth Airport - John Braithwaite
Aluminium HV electrical cable along Bungana & Newton Road
10/11/2011Bungana & Newton Rd5f & 5GGranted30/01/2012Approved1/02/2012Complete
Rhett Nothling
Extension to baggage handling system including Automatic Bag Store & Manual Encode Lines
8/11/2011Terminal 2F9Granted19/12/2011Approved21/12/2011Complete
Sinclair Knight Merz Pty Ltd
Alpha Building - new toilets
8/11/2011Precinct 1A9DGranted27/03/2012Approved28/03/2012Complete
Trevor Pilbeam - SGS
Additional AC to Server Room
8/11/2011Precinct 2A25IGranted5/12/2011Approved16/12/2011Complete
Wayne Frusher - QANTAS
New coolroom panels & AC
1/11/2011Affleck Road - International14MGranted29/11/2011Approved18/01/2012Complete
BGC
Concrete crossovers over the DBNGP
30/10/2011Precinct 3a3Q, 4Q, 3R & 4RGranted22/11/2011Approved24/11/2011Complete
WAC
Enhanced Inspection point security upgrade @ Gate 4
27/10/2011Domestic PrecinctE12In Progress
Perth Airport
Steel frame extension, 1st floor installation, CFC cladding and fit-out works
24/10/2011Terminal 2F9Granted16/11/2011Approved21/11/2011Complete
John Clark - RAC
Grogan Road: internal stair case & patio to the existing building
24/10/2011Grogan RoadO16Granted10/11/2011Approved10/11/2011Complete
Vega Partnership
Construction of 'warm shell' & services
4/10/2011Precinct 2C25I & 25JGranted14/11/2011In Progress
Dave Pottinger
1181 Abernethy Rd: Erection of 2 (6m x 3m) 'FOR SALE' signs
27/09/2011Precinct 35T & 6TIn Progress
WAC
Qantas Stand-off bay: transportable office, toilet, services & lighting
23/09/2011AirsideF7Granted19/10/2011Approved20/10/2011Complete
WAC
T2 & T3 traffic calming
15/09/2011DomesticF9Granted5/01/2012Approved11/01/2012Complete
Coxon Group
Roy Hill offices & remote operations centre
8/09/2011Precinct 225I & 25JGranted1/12/2011Approved1/12/2011In Progress
DNA
Marchmont Gate 1 stage 2: forward works, services, footings & slab with penetrations/cap-offs & carpark ONLY
6/09/2011Precinct 226IGranted16/11/2011Approved16/11/2011Complete
WAC
T2 & T3:  Smokers facilities
17/08/2011T2 & T3F9 & F10Granted27/09/2011Approved11/10/2011Complete
WAC
Tonkin Highway & Dunreath Drive Connection: roadworks, street lights & traffic signals
5/08/2011Dunreath DriveD20Granted12/09/2011Approved31/10/2011Complete
Luke Sharpe - Australia Post
Replace existing HVAC units and installation of 3 new units
20/07/2011DomesticD12Granted24/08/2011In Progress
WAC - Tegan Overall
Rio Tinto Echo 1: Site Clearing Works
13/07/2011Domestic PrecinctD9Granted15/08/2011Approved16/09/2011Complete
Paul Brennan - Intelara
Air Services Australia: Tower refurbishment
30/06/2011InternationalL13Granted9/09/2011In Progress
Nigel Martin  - Cobham Aviation
Internal alterations & steel framed shade structure
24/06/2011General AviationG6Granted30/08/2011Approved31/08/2011Complete
Adam Galvin - Power Serve Communications
Install conduits, hauling & splicing of pits to Commercial Precinct 2A & 2B 20/06/2011 at 9:49 AM
20/06/2011Commercial Precinct 2A & 2B25H, 26H, 25I, 25J & 24JGranted11/08/2011Approved12/08/2011Complete
Shell Australia
Demolition of offices, workshop, fuel transfer area, underground tank farm, garage and shed
5/05/2011Commercial Precinct 1E10Granted31/08/2011Approved5/09/2011Complete
BP Australia
BP Aust: Additions to Perth JUHI Jet-A1 receipt infrastructure including associated pipework & tanker discharge facilitates
5/05/2011International PrecinctJ15Granted21/06/2011Approved21/06/2011Complete
WAC
Abbott Road Macmahon hardstand: excavate, backfill & level ground for limestone hardstand -
28/04/2011Commercial Precinct 4O21Granted1/09/2011Approved13/09/2011Complete
WAC
New Domestic Terminal: construction, road & infrastructure, services, earthworks, fit out & landscaping
11/04/2011International precinctJ14Granted25/05/2011Approved17/08/2011Complete
Rate Australia P/L
Bay 19 & 20 Aerobridge & fixed link installation plus supply cabling and switchgear -
1/04/2011Domestic terminalF9Granted23/05/2011Approved24/05/2011Complete
Cobham Aviation
office renovations and fitout
14/03/2011G5Granted4/04/2011Approved6/04/2011Complete
BP Australia Pty Ltd
Extension of domestic fuel hydrant to bay 7
2/03/2011Bay 7F6 -7In Progress
WAC
Alpha Building Air Conditioning Modifications L2
1/03/2011Alpha BuildingD9Granted27/06/2011Approved28/06/2011Complete
WAC
Roads and Infrastructure (forward works) Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker Rd
28/02/2011Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker RdJ14Granted20/04/2011Approved27/04/2011Complete
Incoll Management Pty Ltd
Update the current Qantas freight coolroom and freezer located at Perth International Ariport: so that it provides an efficient and functional layout, new equipment and increased capacity
27/02/2011Qantas freightM14Granted5/05/2011In Progress
WAC
HMD Safety Improvements - Installation of Safety Barrier to Gas Cabinet
17/02/2011Horrie Miller DriveK18Granted10/03/2011Approved13/03/2011Complete
BGC
BGC Clay Brick Plant - Causeway Construction to protect existing Easement
10/02/2011372,386,387,401,402Q3In Progress
WAC
Remove the runway 06/24 PAPI on the Eastern side and relocate the PAPI on the Western side
3/02/2011Runway 06/24G11Granted3/05/2011Approved3/05/2011Complete
WAC
construction of new T3 standoff apron for 2xE and 3C aircraft in place of the old fire station.  Works include drainage works from TWY Delta to TWY Whiskey and beyond to a new outlet headwall
3/02/2011T3G10Granted12/04/2011In Progress
WAC
GSE Extension - Bay 56 International Apron
5/01/2011International ApronL 12Granted14/02/2011Approved3/03/2011Complete
WAC
WAC Domestic Carparks Reconfiguration and Expansion
22/12/2010Domestic PrecinctDomestic PrecinctGranted16/03/2011Approved22/03/2011Complete
SGS Australia
SGS - Airconditioning Installation - Reid Road
29/11/2010Reid RoadH 24Granted15/02/2011In Progress
WAC - T1 Inbound
T1 Inbound Processing Refurbishment $ Expansion - Extensions & Expansion to Grd Floor Arrivals Hall, 1st Floor Arrivals Corridor & 2nd Floor Depture Lounge & Stairwell
4/11/2010Terminal 1K12Granted19/12/2010Approved3/01/2011Complete
WAC
Terminal 3 - Installation of Split System AC in IT & Electrical Services Rooms
25/10/2010Terminal 3F9Granted4/11/2010Approved7/11/2010Complete
Airflite Pty Ltd
26 Newton Rd - Construction of New Hangar, Workshop, Offices and Apron Development
25/10/201026 Newton RdH4In Progress
BP Australia Pty Ltd - AirBP Perth JUHI Depot
Security Upgrade & Installation of Hot Works Workshop & Diesel Additive storage shed
6/10/2010International PrecinctJ15Granted16/11/2010Approved17/11/2010Complete
BP Australia Pty Ltd
AirBP Perth Domestic Depot - Security Upgrade & Installation of Fueller loading equipment shelter & loading arm
4/10/2010Cnr MacRobertson Dr & Miller RdE10Granted28/10/2010Approved1/11/2010Complete
1 - 100 Next