| Perth Inflight Catering | Internal renovations to create a wash room | 14/05/2012 | General Aviation | G5 | | | | | In Progress |
| Airservices Australia | Upgrade the Runway 03 & Runway 21 Localiser antenna array; and Construction of Distance Measuring Equipment (DME) antenna at Runway 21 and Runway 24 Glide path sites | 11/05/2012 | numerous locations | I5, J8, L9 & F22 | | | | | In Progress |
| APP for PAPL | Install 400sq. mm AI HV ring main section between Falcon Substation, Fauntleroy Substation, Cabin Services Substation and Kendall switch-room. 24 core fibre optic cable to be co-trenched. | 11/05/2012 | Airside | H6 to H16 & I16 | | | | | In Progress |
| Aurecon for PAPL | Investigation for Skippers & Cobham parking | 10/05/2012 | GA airside | F6 & G6 | | | | | In Progress |
| Bruce Arnold - AsA | install upgraded lightning protection system and replace radar equipment | 9/05/2012 | | N4 | | | | | In Progress |
| Diversified Services | Upgrade existing pits to manholes and installation of communication conduits and haul optical fibre cable
| 8/05/2012 | International Precinct | 24I, 24J, 25I, 25J & 15K | | | | | In Progress |
| APP for PAPL | Installation of a new High Pressure Gas connection and regulator equipment to the New Domestic Terminal Co-Gen building. Installation to run adjacent to existing MP gas main | 8/05/2012 | International Precinct | 13K, 14K, 15K | | | | | In Progress |
| Nick Forostenko | Construction of a deconstruction room at Customs on Fricker Road | 7/05/2012 | Internation Precinct | 15L | | | | | In Progress |
| City of Belmont | Installation of a 100mm thick footpath 2.5m wide and 30m long | 3/05/2012 | Domestic Precinct | 9C | | | | | In Progress |
| APP for PAPL | Installation of new primary ring mains, replacement of existing distribution ring mains units, replacement of existing transformer and low voltage distribution board and new earthing at Cabin services | 3/05/2012 | Domestic | 7E & 6F | | | | | In Progress |
| QANTAS | Installation of a 100mm panel constructed modular wash complex | 2/05/2012 | International Precinct | 14M | | | | | In Progress |
| PAPL | Road safety improvements to the PAPL road networks including lighting, signs & kerbing | 27/04/2012 | Numerous locations | Numerous locations | | | | | In Progress |
| APN Outdoor | Gantry - Current panels to be removed, reinstated and digital screens in stalled Light boxes - 2 x light boxes to be installed at forecourt | 20/04/2012 | Domestic Precinct | 9D & 9F | | | | | In Progress |
| APN Outdoor | New advertising light boxes to be attached to existing infrastructure behind the walls. Digital advertising screens to be installed/bolted to the floor | 19/04/2012 | Domestic and International | F9 & K12 | | | | | In Progress |
| Perth Mint - Graeme Martin | Single level concrete tilt panel building with metal roof surrounded by cyclone mesh fence | 19/04/2012 | Precinct 2 | I21 | | | | | In Progress |
| Fairlandview Investments Pty Ltd | Construction of a warehouse and office facility. Concrete floor, tilt up concrete walls | 10/04/2012 | Precinct 3 | 2T | | | | | In Progress |
| PAPL | Construction of asphalt pavement for aircraft parking with associated infrastructure
| 5/04/2012 | Airside | 7G & 7H | | | | | In Progress |
| Dave Bolton DAFF | Haul through existing conduits to pit outside IP&MP office and excavation and new conduits into AQIS. | 2/04/2012 | International | 15K | Granted | 16/05/2012 | | | In Progress |
| APP for PAPL | Provide an additional 329 parking bays next to Rio Tinto | 1/04/2012 | Precinct 1 | 9D | Granted | 30/04/2012 | Approved | 1/05/2012 | Complete |
| PAPL | pavement extension to Taxiway Romeo apron | 30/03/2012 | Airside | 4H & 5H | Granted | 2/05/2012 | Approved | 7/05/2012 | Complete |
| PAPL | Installation of a patio at the IP&MP office | 30/03/2012 | Domestic Precinct | 15K | Granted | 24/04/2012 | Approved | 2/05/2012 | Complete |
| Wayne Frusher - Qantas | Steel framed hardstands to accomodate refrigeration units | 22/03/2012 | International Precinct | M14 | | | | | In Progress |
| Gary Cox | Soil sampling at 4 locations | 16/03/2012 | Domestic | E8 | Granted | 4/04/2012 | Approved | 5/04/2012 | Complete |
| Neil Hawkins - MacMahon | Internal office alterations and additions | 13/03/2012 | Precinct 4 | 17O & 17P | Granted | 13/04/2012 | Approved | 14/05/2012 | Complete |
| KMC Group | Removal of existing underground storage tanks at T1 & T3 and surface remedial tanks | 12/03/2012 | International & Domestic terminals | L12 & G8 | Granted | 4/04/2012 | Approved | 13/04/2012 | Complete |
| Environmental Strategies | Installation of a groundwater moitoring bore to the north of the Perth Mint Refinery | 12/03/2012 | Precinct 2 | I21 | Granted | 18/04/2012 | Approved | 26/04/2012 | Complete |
| Bernard Speldewinde | Traffic / ticket office fitout | 29/02/2012 | International terminal | K12 | Granted | 4/04/2012 | Approved | 19/04/2012 | Complete |
| Qantas | Provide temporary equipment office & executive office at 41 Affleck Road | 28/02/2012 | International Precinct | 14M | | | | | In Progress |
| Telstra | Installation of conduits, pit and communications for 9 Dawson Road | 20/02/2012 | International Precinct | L14 | Granted | 16/03/2012 | Approved | 19/03/2012 | Complete |
| PAPL | T1 Lvl 1 Screening point upgrades / renovations to facilitate new screening equipment | 16/02/2012 | International | K12 | Granted | 10/05/2012 | | | In Progress |
| Point Project Management | demolition of existing car rental booths and replace with new booths | 15/02/2012 | Domestic | F9 | Granted | 16/03/2012 | Approved | 19/03/2012 | Complete |
| PAPL | baggage reclaim, primary line and duty free | 10/02/2012 | Internation Terminal | 12L | Granted | 18/04/2012 | Approved | 14/05/2012 | Complete |
| Airservices Australia | Installation of A-SMGCS equipment | 8/02/2012 | numerous locations | Numerous locations | Granted | 18/04/2012 | Approved | 3/05/2012 | Complete |
| Bob Sykes | Closure of GWD by creating a Cul-de-sac | 1/02/2012 | Precinct 1 | 8d & 9D | Granted | 16/03/2012 | Approved | 1/05/2012 | Complete |
| Nathan Freeman | De-fit of existing tenancy and fit-out for new tenancy | 29/01/2012 | Terminal 2 | F9 | Granted | 26/02/2012 | Approved | 9/03/2012 | Complete |
| Trevor Pilbeam - SGS | provide a limestone base car park | 25/01/2012 | Precinct 2A | 24H | | | | | In Progress |
| Morgan Siter | Asphalt car wash bay and yard extension | 19/01/2012 | Precinct 3A | E10 | Granted | 23/04/2012 | Approved | 2/05/2012 | Complete |
| LS Travel Retail Pacific | Relocation of counter and fridges and construct wall bays and walls to reflect | 16/01/2012 | International Terminal | K12 | Granted | 28/02/2012 | Approved | 6/03/2012 | Complete |
| Sanjeewa Ratnayaka | Relocation of existing services and forward works for new services from Co Gen to T1 Arrivals and pressuring fire ring main | 13/01/2012 | Terminal 1 | 12K | Granted | 16/02/2012 | Approved | 20/02/2012 | Complete |
| Bill Sherrington | Small Talk Cafe Temporary lunch shop | 6/01/2012 | Precinct 1C | 6E | Granted | 6/02/2012 | Approved | 16/02/2012 | Complete |
| Neil Hawkins MacMahon | | 4/01/2012 | Precinct 4 | 20O | Granted | 25/01/2012 | Approved | 27/01/2012 | Complete |
| L Buckeridge | Removal of asphalt in SE corner excluding the DBNGP | 29/12/2011 | Precinct 3 | 5S | Granted | 27/04/2012 | Approved | 10/05/2012 | Complete |
| Nigel Martin | Internal renovation to create office space | 21/12/2011 | General Aviation | 5G | Granted | 25/01/2012 | Approved | 31/01/2012 | Complete |
| Perth Airport | Construction of switchroom and procurement/installation of electrical HV Switch gear | 20/12/2011 | International Precinct | 16J | | | | | In Progress |
| Sid Moore - Toll Express | Construction of Hardstand including drainage, kerbing, signs, line-marking and lighting
| 19/12/2011 | International Precinct | 18K & 18L | Granted | 22/04/2012 | Approved | 1/05/2012 | In Progress |
| John Braithwaite | Munday Substation: Remedial works | 14/12/2011 | International Precinct | 22m & 22N | Granted | 12/03/2012 | Approved | 8/05/2012 | Complete |
| Len Buckeridge | Construction of limestone wall along Kalamunda Road | 14/12/2011 | Precinct 3 | 5R | Granted | 19/01/2012 | Approved | 24/01/2012 | Complete |
| Len Buckeridge | BGC: removal of asphalt over DBNGP easement in SE corner | 14/12/2011 | Precinct 3 | 5S | Granted | 26/04/2012 | | | In Progress |
| Brendon Sadler | Installation of light box signage | 13/12/2011 | General Aviation | 7E | Granted | 11/01/2012 | Approved | 24/02/2012 | Complete |
| Adrian Pietropaolo | T1 Departures - Rip Curl & Purely Australian de-fit to concourse | 7/12/2011 | International Terminal | K12 | Granted | 4/01/2012 | Approved | 9/01/2012 | Complete |
| Don Bridges - Perth Airport | asphalt pavement for aircraft parking
| 30/11/2011 | Airside | 5H | Granted | 7/12/2011 | Approved | 7/12/2011 | Complete |
| Don Bridges | Construction of concrete and asphalt apron with associated lighting and drainage works | 30/11/2011 | International | 12J & 12K | Granted | 12/01/2012 | Approved | 19/01/2012 | Complete |
| Len Buckeridge | asphalt to south east corner
| 30/11/2011 | Precinct 3A | 4R, 5R & 5S | | | | | In Progress |
| Perth Airport | Relocation of taxi rank, bus bays & car rental facilities
| 29/11/2011 | International Precinct | 12L, 13L & 14L | Granted | 26/02/2012 | Approved | 27/02/2012 | Complete |
| Graeme Martin - Perth Mint | Concrete and Steel Storage Facility
| 22/11/2011 | Precinct 2B | 21I | Granted | 1/05/2012 | | | In Progress |
| Perth Airport | TWA: Additional airline lounges | 21/11/2011 | Sugarbird Lady Road | 14J & 14K | Granted | 19/12/2011 | Approved | 6/03/2012 | Complete |
| Perth Airport - John Braithwaite | Aluminium HV electrical cable along Bungana & Newton Road | 10/11/2011 | Bungana & Newton Rd | 5f & 5G | Granted | 30/01/2012 | Approved | 1/02/2012 | Complete |
| Rhett Nothling | Extension to baggage handling system including Automatic Bag Store & Manual Encode Lines | 8/11/2011 | Terminal 2 | F9 | Granted | 19/12/2011 | Approved | 21/12/2011 | Complete |
| Sinclair Knight Merz Pty Ltd | Alpha Building - new toilets
| 8/11/2011 | Precinct 1A | 9D | Granted | 27/03/2012 | Approved | 28/03/2012 | Complete |
| Trevor Pilbeam - SGS | Additional AC to Server Room
| 8/11/2011 | Precinct 2A | 25I | Granted | 5/12/2011 | Approved | 16/12/2011 | Complete |
| Wayne Frusher - QANTAS | | 1/11/2011 | Affleck Road - International | 14M | Granted | 29/11/2011 | Approved | 18/01/2012 | Complete |
| BGC | Concrete crossovers over the DBNGP | 30/10/2011 | Precinct 3a | 3Q, 4Q, 3R & 4R | Granted | 22/11/2011 | Approved | 24/11/2011 | Complete |
| WAC | Enhanced Inspection point security upgrade @ Gate 4 | 27/10/2011 | Domestic Precinct | E12 | | | | | In Progress |
| Perth Airport | Steel frame extension, 1st floor installation, CFC cladding and fit-out works | 24/10/2011 | Terminal 2 | F9 | Granted | 16/11/2011 | Approved | 21/11/2011 | Complete |
| John Clark - RAC | Grogan Road: internal stair case & patio to the existing building | 24/10/2011 | Grogan Road | O16 | Granted | 10/11/2011 | Approved | 10/11/2011 | Complete |
| Vega Partnership | Construction of 'warm shell' & services | 4/10/2011 | Precinct 2C | 25I & 25J | Granted | 14/11/2011 | | | In Progress |
| Dave Pottinger | 1181 Abernethy Rd: Erection of 2 (6m x 3m) 'FOR SALE' signs | 27/09/2011 | Precinct 3 | 5T & 6T | | | | | In Progress |
| WAC | Qantas Stand-off bay: transportable office, toilet, services & lighting | 23/09/2011 | Airside | F7 | Granted | 19/10/2011 | Approved | 20/10/2011 | Complete |
| WAC | | 15/09/2011 | Domestic | F9 | Granted | 5/01/2012 | Approved | 11/01/2012 | Complete |
| Coxon Group | Roy Hill offices & remote operations centre
| 8/09/2011 | Precinct 2 | 25I & 25J | Granted | 1/12/2011 | Approved | 1/12/2011 | In Progress |
| DNA | Marchmont Gate 1 stage 2: forward works, services, footings & slab with penetrations/cap-offs & carpark ONLY | 6/09/2011 | Precinct 2 | 26I | Granted | 16/11/2011 | Approved | 16/11/2011 | Complete |
| WAC | T2 & T3: Smokers facilities | 17/08/2011 | T2 & T3 | F9 & F10 | Granted | 27/09/2011 | Approved | 11/10/2011 | Complete |
| WAC | Tonkin Highway & Dunreath Drive Connection: roadworks, street lights & traffic signals | 5/08/2011 | Dunreath Drive | D20 | Granted | 12/09/2011 | Approved | 31/10/2011 | Complete |
| Luke Sharpe - Australia Post | Replace existing HVAC units and installation of 3 new units
| 20/07/2011 | Domestic | D12 | Granted | 24/08/2011 | | | In Progress |
| WAC - Tegan Overall | Rio Tinto Echo 1: Site Clearing Works | 13/07/2011 | Domestic Precinct | D9 | Granted | 15/08/2011 | Approved | 16/09/2011 | Complete |
| Paul Brennan - Intelara | Air Services Australia: Tower refurbishment | 30/06/2011 | International | L13 | Granted | 9/09/2011 | | | In Progress |
| Nigel Martin - Cobham Aviation | Internal alterations & steel framed shade structure | 24/06/2011 | General Aviation | G6 | Granted | 30/08/2011 | Approved | 31/08/2011 | Complete |
| Adam Galvin - Power Serve Communications | Install conduits, hauling & splicing of pits to Commercial Precinct 2A & 2B 20/06/2011 at 9:49 AM
| 20/06/2011 | Commercial Precinct 2A & 2B | 25H, 26H, 25I, 25J & 24J | Granted | 11/08/2011 | Approved | 12/08/2011 | Complete |
| Shell Australia | Demolition of offices, workshop, fuel transfer area, underground tank farm, garage and shed | 5/05/2011 | Commercial Precinct 1 | E10 | Granted | 31/08/2011 | Approved | 5/09/2011 | Complete |
| BP Australia | BP Aust: Additions to Perth JUHI Jet-A1 receipt infrastructure including associated pipework & tanker discharge facilitates | 5/05/2011 | International Precinct | J15 | Granted | 21/06/2011 | Approved | 21/06/2011 | Complete |
| WAC | Abbott Road Macmahon hardstand: excavate, backfill & level ground for limestone hardstand -
| 28/04/2011 | Commercial Precinct 4 | O21 | Granted | 1/09/2011 | Approved | 13/09/2011 | Complete |
| WAC | New Domestic Terminal: construction, road & infrastructure, services, earthworks, fit out & landscaping
| 11/04/2011 | International precinct | J14 | Granted | 25/05/2011 | Approved | 17/08/2011 | Complete |
| Rate Australia P/L | Bay 19 & 20 Aerobridge & fixed link installation plus supply cabling and switchgear - | 1/04/2011 | Domestic terminal | F9 | Granted | 23/05/2011 | Approved | 24/05/2011 | Complete |
| Cobham Aviation | office renovations and fitout | 14/03/2011 | | G5 | Granted | 4/04/2011 | Approved | 6/04/2011 | Complete |
| BP Australia Pty Ltd | Extension of domestic fuel hydrant to bay 7 | 2/03/2011 | Bay 7 | F6 -7 | | | | | In Progress |
| WAC | Alpha Building Air Conditioning Modifications L2 | 1/03/2011 | Alpha Building | D9 | Granted | 27/06/2011 | Approved | 28/06/2011 | Complete |
| WAC | Roads and Infrastructure (forward works) Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker Rd | 28/02/2011 | Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker Rd | J14 | Granted | 20/04/2011 | Approved | 27/04/2011 | Complete |
| Incoll Management Pty Ltd | Update the current Qantas freight coolroom and freezer located at Perth International Ariport: so that it provides an efficient and functional layout, new equipment and increased capacity | 27/02/2011 | Qantas freight | M14 | Granted | 5/05/2011 | | | In Progress |
| WAC | HMD Safety Improvements - Installation of Safety Barrier to Gas Cabinet | 17/02/2011 | Horrie Miller Drive | K18 | Granted | 10/03/2011 | Approved | 13/03/2011 | Complete |
| BGC | BGC Clay Brick Plant - Causeway Construction to protect existing Easement | 10/02/2011 | 372,386,387,401,402 | Q3 | | | | | In Progress |
| WAC | Remove the runway 06/24 PAPI on the Eastern side and relocate the PAPI on the Western side | 3/02/2011 | Runway 06/24 | G11 | Granted | 3/05/2011 | Approved | 3/05/2011 | Complete |
| WAC | construction of new T3 standoff apron for 2xE and 3C aircraft in place of the old fire station. Works include drainage works from TWY Delta to TWY Whiskey and beyond to a new outlet headwall | 3/02/2011 | T3 | G10 | Granted | 12/04/2011 | | | In Progress |
| WAC | GSE Extension - Bay 56 International Apron | 5/01/2011 | International Apron | L 12 | Granted | 14/02/2011 | Approved | 3/03/2011 | Complete |
| WAC | WAC Domestic Carparks Reconfiguration and Expansion | 22/12/2010 | Domestic Precinct | Domestic Precinct | Granted | 16/03/2011 | Approved | 22/03/2011 | Complete |
| SGS Australia | SGS - Airconditioning Installation - Reid Road | 29/11/2010 | Reid Road | H 24 | Granted | 15/02/2011 | | | In Progress |
| WAC - T1 Inbound | T1 Inbound Processing Refurbishment $ Expansion - Extensions & Expansion to Grd Floor Arrivals Hall, 1st Floor Arrivals Corridor & 2nd Floor Depture Lounge & Stairwell | 4/11/2010 | Terminal 1 | K12 | Granted | 19/12/2010 | Approved | 3/01/2011 | Complete |
| WAC | Terminal 3 - Installation of Split System AC in IT & Electrical Services Rooms | 25/10/2010 | Terminal 3 | F9 | Granted | 4/11/2010 | Approved | 7/11/2010 | Complete |
| Airflite Pty Ltd | 26 Newton Rd - Construction of New Hangar, Workshop, Offices and Apron Development | 25/10/2010 | 26 Newton Rd | H4 | | | | | In Progress |
| BP Australia Pty Ltd - AirBP Perth JUHI Depot | Security Upgrade & Installation of Hot Works Workshop & Diesel Additive storage shed | 6/10/2010 | International Precinct | J15 | Granted | 16/11/2010 | Approved | 17/11/2010 | Complete |
| BP Australia Pty Ltd | AirBP Perth Domestic Depot - Security Upgrade & Installation of Fueller loading equipment shelter & loading arm | 4/10/2010 | Cnr MacRobertson Dr & Miller Rd | E10 | Granted | 28/10/2010 | Approved | 1/11/2010 | Complete |