Register of Building Applications.

Information about application for building activities at Perth Airport.

Background

Land use planning and building control at Perth Airport is regulated by the Airports Act 1996 (Act). This means that State law does not apply and all building approvals for building activity on Perth Airport land are issued under Commonwealth law.

Regulations have been made pursuant to the Act, and the regulations dealing with the approval of building activities (as defined in the Act) are the Airports (Building Control) Regulations 1996. The Regulations set out the way in which applications are made for approval of building activities, as well as the matters the Airport Building Controller (ABC) considers applications before an approval is issued.

Before building activity is commenced on Perth Airport land, a permit under the provisions of the Airports Act 1996 and Airports (Building Control) Regulations 1996 must be obtained from the Airport Building Controller.

A building activity is defined as:-
  1. Construction of buildings or other structure;
  2. Alterations to the structure of buildings or other structures;
  3. Constructing or altering earthworks (whether or not in relation to a buildings etc.)
  4. Constructing or altering engineering, electrical or hydraulic works;
  5. Demolishing , destroying, dismantling or removing: - Building, structure, earthworks, engineering works, electrical works and hydraulic works.

Structures include bridges, fences, towers, pylons and temporary structures such as tents.

Earth work or engineering works include runways, taxiways, aprons, roads, car parks, retaining walls, dams, railways pipelines, road surfaces, car park surfaces and tunnels.

The approval process also involves obtaining the consent of the Airport Lessee Company (ALC) which is Westralia Airports Corporation (WAC).

The Regulations describe the things Perth Airport must be satisfied about before it gives its consent, such as whether the proposed building activity is consistent with the Perth Airport Master Plan.

Information published on this website

As of 27 March 2010 the Regulations require certain information about building applications at Perth Airport to be published by the ALC on the Perth Airport website. Accordingly, this information is published by WAC in accordance with the requirements of the Regulations.

Note: The “Date of Application” is the date that the ALC received the application from the ABC if the applicant is not the ALC and is the date the application was submitted to the ABC if the applicant is the ALC.

DescriptionFilter
PAPL
T1 Lvl 1 Screening point upgrades / renovations to facilitate new screening equipment
16/02/2012International K12In Progress
Point Project Management
demolition of existing car rental booths and replace with new booths
15/02/2012DomesticF9In Progress
PAPL
baggage reclaim, primary line and duty free
10/02/2012Internation Terminal 12LIn Progress
PAPL
installation of signage, additions to lighting and installation of de-fibs
9/02/2012Precinct 19DIn Progress
Airservices Australia
Installation of A-SMGCS equipment
8/02/2012numerous locationsNumerous locations In Progress
Bob Sykes
Closure of GWD by creating a Cul-de-sac
1/02/2012Precinct 18d & 9DIn Progress
Nathan Freeman
De-fit of existing tenancy and fit-out for new tenancy
29/01/2012Terminal 2F9In Progress
Trevor Pilbeam - SGS
provide a limestone base car park
24/01/2012Precinct 2A24HIn Progress
Morgan Siter
Asphalt car wash bay and yard extension
19/01/2012Precinct 3AE10In Progress
Neil Heather
New high efficiency bulbs to be installed
18/01/2012Domestic TerminalF9In Progress
LS Travel Retail Pacific
Relocation of counter and fridges and construct wall bays and walls to reflect
16/01/2012International TerminalK12In Progress
Sanjeewa Ratnayaka
Relocation of existing services and forward works for new services from Co Gen to T1 Arrivals and pressuring fire ring main
13/01/2012Terminal 112KGranted16/02/2012Approved20/02/2012Complete
Golder
Geotech Investigation
11/01/2012International 12JGranted3/02/2012In Progress
Bill Sherrington
Small Talk Cafe Temporary lunch shop
5/01/2012Precinct 1C6EGranted5/02/2012Approved15/02/2012Complete
Neil Hawkins MacMahon
MacMahon Brick paving
4/01/2012Precinct 420OGranted25/01/2012Approved27/01/2012Complete
L Buckeridge
Removal of asphalt in SE corner excluding the DBNGP
29/12/2011Precinct 35SIn Progress
Nigel Martin
Internal renovation to create office space
21/12/2011General Aviation5GGranted25/01/2012Approved31/01/2012Complete
Signarama
Installation of 2.4m x 6m pylon sign
21/12/2011General Aviation International15JIn Progress
Perth Airport
Construction of switchroom and procurement/installation of electrical HV Switch gear
20/12/2011International Precinct16JIn Progress
Sid Moore - Toll Express
Construction of Hardstand including drainage, kerbing, signs, line-marking and lighting
19/12/2011International Precinct18K & 18LIn Progress
John Braithwaite
Munday Substation: Remedial works
14/12/2011International Precinct22m & 22NIn Progress
Len Buckeridge
Construction of limestone wall along Kalamunda Road
14/12/2011Precinct 35RGranted19/01/2012Approved24/01/2012Complete
Len Buckeridge
BGC: removal of asphalt over DBNGP easement in SE corner
14/12/2011Precinct 35SIn Progress
Brendon Sadler
Installation of light box signage
13/12/2011General Aviation7EGranted11/01/2012In Progress
Adrian Pietropaolo
T1 Departures - Rip Curl & Purely Australian de-fit to concourse
7/12/2011International TerminalK12Granted4/01/2012In Progress
Don Bridges - Perth Airport
asphalt pavement for aircraft parking
30/11/2011Airside5HGranted7/12/2011Approved7/12/2011In Progress
Perth Airport
Relocation of taxi rank, bus bays & car rental facilities
30/11/2011International Precinct12L, 13L & 14LIn Progress
Don Bridges
Construction of concrete and asphalt apron with associated lighting and drainage works
30/11/2011International12J & 12KGranted12/01/2012Approved19/01/2012Complete
Len Buckeridge
asphalt to south east corner
29/11/2011Precinct 3A4R, 5R & 5SIn Progress
Graeme Martin - Perth Mint
Concrete and Steel Storage Facility
22/11/2011Precinct 2B21IIn Progress
Perth Airport
Power upgrade to Pillar 6 - Two underground 125mm conduits - drill shot
22/11/2011Domestic Precinct8E & 8FGranted19/12/2011Approved20/12/2011Complete
Perth Airport
TWA: Additional airline lounges
21/11/2011Sugarbird Lady Road14J & 14KGranted19/12/2011In Progress
Toll Express
Geotech Investigation
13/11/2011Precinct 2C18K & 18LGranted30/11/2011Approved6/12/2011Complete
Perth Airport - John Braithwaite
Aluminium HV electrical cable along Bungana & Newton Road
10/11/2011Bungana & Newton Rd5f & 5GGranted30/01/2012In Progress
Sinclair Knight Merz Pty Ltd
Alpha Building - new toilets
9/11/2011Precinct 1A9DIn Progress
Forti Rossi
Stairs to demountable building
9/11/2011General Aviation5HGranted30/11/2011In Progress
Rhett Nothling - QANTAS
Qantas: Hangar 306 Internal fit out: racking, amenities, breakout room & admin
8/11/2011Domestic8GGranted29/11/2011Approved12/02/2012Complete
Rhett Nothling
Extension to baggage handling system including Automatic Bag Store & Manual Encode Lines
8/11/2011Terminal 2F9Granted19/12/2011Approved21/12/2011Complete
Trevor Pilbeam - SGS
Additional AC to Server Room
8/11/2011Precinct 2A25IGranted5/12/2011Approved16/12/2011Complete
WAC
Cyclone fencing to the Viewing Platform Perimeter
7/11/2011Dunreath Drive19EGranted24/11/2011Approved30/11/2011Complete
WAC
Electrical Upgrade
2/11/2011Precinct 2A24HGranted13/11/2011Approved17/11/2011Complete
WAC
Canopy Extension
2/11/2011Precinct 2A24HGranted13/11/2011Approved17/01/2012Complete
Wayne Frusher - QANTAS
New coolroom panels & AC
1/11/2011Affleck Road - International14MGranted29/11/2011In Progress
BGC
Concrete crossovers over the DBNGP
30/10/2011Precinct 3a3Q, 4Q, 3R & 4RGranted22/11/2011Approved24/11/2011Complete
WAC
Enhanced Inspection point security upgrade @ Gate 4
26/10/2011Domestic PrecinctE12In Progress
Perth Airport
Steel frame extension, 1st floor installation, CFC cladding and fit-out works
23/10/2011Terminal 2F9Granted15/11/2011Approved20/11/2011Complete
John Clark - RAC
Grogan Road: internal stair case & patio to the existing building
23/10/2011Grogan RoadO16Granted10/11/2011Approved10/11/2011Complete
Rhett Nothling
Canopy to Gate 11 external stairs
23/10/2011Terminal 2F9Granted18/11/2011Approved21/11/2011Complete
Paul Clements
install communication conduits, pits & optical fibre cable
10/10/2011Precinct 2BI21 & J21Granted21/11/2011Approved29/11/2011Complete
Selected Plumbing
Fire Service Upgrade
9/10/2011Precinct 2B Horrie Miller DriveI21Granted18/11/2011Approved6/12/2011In Progress
Vega Partnership
Construction of 'warm shell' & services
4/10/2011Precinct 2C25I & 25JGranted14/11/2011In Progress
Oldfield Knott Architects
Internal Office fit-out
3/10/2011DomesticE8Granted10/11/2011In Progress
Dave Pottinger
1181 Abernethy Rd: Erection of 2 (6m x 3m) 'FOR SALE' signs
26/09/2011Precinct 35T & 6TIn Progress
WAC
Qantas Stand-off bay: transportable office, toilet, services & lighting
22/09/2011AirsideF7Granted18/10/2011Approved19/10/2011Complete
Anthony Wood
Geohydrological investigation adjacent to Tonkin/Leach Highway Intersection
22/09/2011Precinct 2A21E & 21FGranted3/11/2011Approved7/11/2011Complete
WAC
T2 & T3 traffic calming
15/09/2011DomesticF9Granted5/01/2012Approved11/01/2012Complete
Rhett Nothling
Qantas: Handrail & Door Modification at boarding gate 11
13/09/2011DomesticF8Granted12/09/2011In Progress
Rio Tinto
Rio Tinto: Installation of additional workstations including data & electrical cabling
8/09/2011Precinct 1A8DGranted27/09/2011Approved28/09/2011Complete
Coxon Group
Roy Hill offices & remote operations centre
7/09/2011Precinct 225I & 25JGranted30/11/2011Approved30/11/2011In Progress
DNA
Marchmont Gate 1 stage 2: forward works, services, footings & slab with penetrations/cap-offs & carpark ONLY
6/09/2011Precinct 226IGranted16/11/2011Approved16/11/2011Complete
WAC
Fauntleroy/Bungana: construction of a new round-a-bout and associated lights
30/08/2011Precinct 1D6Granted29/09/2011Approved2/10/2011Complete
WAC
T2 & T3:  Smokers facilities
16/08/2011T2 & T3F9 & F10Granted26/09/2011Approved10/10/2011Complete
WAC
Services, landscaping & carpark for temporary office building
16/08/2011Internation PrecinctK14Granted18/08/2011Approved21/08/2011Complete
WAC
TWA forward works: Gate 1 Redevelopment - amendment to include Office building
9/08/2011InternationalJ16Granted29/08/2011Approved31/08/2011Complete
RAC
RAC Driving Centre: Internal building renovations - AMENDMENT TO INCLUDE PATIO -
4/08/2011InternationalO16Granted1/08/2011Approved3/08/2011Complete
WAC
Tonkin Highway & Dunreath Drive Connection: roadworks, street lights & traffic signals
4/08/2011Dunreath DriveD20Granted11/09/2011Approved31/10/2011Complete
WAC - Tegan Overall
Rio Tinto Echo 1: Site Clearing Works
12/07/2011Domestic PrecinctD9Granted14/08/2011Approved15/09/2011Complete
Network Aviation
Network Aviation: Temporary Terminal Extension
6/07/2011General Aviation5G & 5HGranted28/08/2011Approved31/08/2011Complete
Paul Brennan - Intelara
Air Services Australia: Tower refurbishment
29/06/2011InternationalL13Granted8/09/2011In Progress
Witchery Fashion
T1 Witchery: Defit
26/06/2011International TerminalK12Granted7/08/2011Approved7/08/2011Complete
Nigel Martin  - Cobham Aviation
Internal alterations & steel framed shade structure
23/06/2011General AviationG6Granted29/08/2011Approved30/08/2011Complete
Adam Galvin - Power Serve Communications
Install conduits, hauling & splicing of pits to Commercial Precinct 2A & 2B 20/06/2011 at 9:49 AM
19/06/2011Commercial Precinct 2A & 2B25H, 26H, 25I, 25J & 24JGranted10/08/2011Approved11/08/2011Complete
Samuel Fardoe Architect
Australia Post: ULD Barriers
19/06/2011Domestic11C/DGranted27/07/2011Approved28/07/2011Complete
John Clark
Internal building renovations
13/06/2011International precinctO 16Granted13/07/2011Approved18/07/2011Complete
WAC
T1: replace 4 existing escalators in foyer of building with new units
8/06/2011International AirportK12Granted24/07/2011Approved2/08/2011Complete
WAC
Public Aircraft Viewing Platform
29/05/2011Dunreath DriveE 19Granted1/08/2011Approved30/08/2011Complete
Shell Australia
Demolition of offices, workshop, fuel transfer area, underground tank farm, garage and shed
4/05/2011Commercial Precinct 1E10Granted30/08/2011Approved4/09/2011Complete
BP Australia
BP Aust: Additions to Perth JUHI Jet-A1 receipt infrastructure including associated pipework & tanker discharge facilitates
4/05/2011International PrecinctJ15Granted20/06/2011Approved20/06/2011Complete
WAC
Abbott Road Macmahon hardstand: excavate, backfill & level ground for limestone hardstand -
27/04/2011Commercial Precinct 4O21Granted31/08/2011Approved12/09/2011Complete
WAC
New Domestic Terminal: construction, road & infrastructure, services, earthworks, fit out & landscaping
10/04/2011International precinctJ14Granted24/05/2011Approved16/08/2011Complete
WAC
T1 - Bay 56: Pedestrian walkway: steel structure with Colorbond roof
6/04/2011INTERNATIONALL12Granted30/05/2011Approved31/05/2011Complete
Rate Australia P/L
Bay 19 & 20 Aerobridge & fixed link installation plus supply cabling and switchgear -
31/03/2011Domestic terminalF9Granted22/05/2011Approved23/05/2011Complete
Oldfield Knott Architects
Perth Flight Centre & UTS Geophysics Refurbishment, external painting and reconfiguration of car park
29/03/2011GENERAL AVIATIONE7Granted20/04/2011Approved22/05/2011Complete
Cobham Aviation
office renovations and fitout
14/03/2011G5Granted3/04/2011Approved5/04/2011Complete
BP Australia Pty Ltd
Extension of domestic fuel hydrant to bay 7
2/03/2011Bay 7F6 -7In Progress
WAC
Alpha Building Air Conditioning Modifications L2
1/03/2011Alpha BuildingD9Granted26/06/2011Approved27/06/2011Complete
WAC
Roads and Infrastructure (forward works) Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker Rd
28/02/2011Perth Int Airport HMD, Grogan, Sugarbird Lady Dr & Fricker RdJ14Granted19/04/2011Approved26/04/2011Complete
Incoll Management Pty Ltd
Update the current Qantas freight coolroom and freezer located at Perth International Ariport: so that it provides an efficient and functional layout, new equipment and increased capacity
27/02/2011Qantas freightM14Granted4/05/2011In Progress
WAC
HMD Safety Improvements - Installation of Safety Barrier to Gas Cabinet
17/02/2011Horrie Miller DriveK18Granted10/03/2011Approved13/03/2011Complete
BGC
BGC Clay Brick Plant - Causeway Construction to protect existing Easement
10/02/2011372,386,387,401,402Q3In Progress
WAC
Remove the runway 06/24 PAPI on the Eastern side and relocate the PAPI on the Western side
3/02/2011Runway 06/24G11Granted2/05/2011Approved2/05/2011Complete
WAC
construction of new T3 standoff apron for 2xE and 3C aircraft in place of the old fire station.  Works include drainage works from TWY Delta to TWY Whiskey and beyond to a new outlet headwall
3/02/2011T3G10Granted11/04/2011In Progress
SGS Australia Ltd
SGS - Steel Framed Sun Shade - Reid Road
19/01/2011Reid RoadH 25Granted7/06/2011Complete
WAC
GSE Extension - Bay 56 International Apron
5/01/2011International ApronL 12Granted14/02/2011Approved3/03/2011Complete
WAC
WAC Domestic Carparks Reconfiguration and Expansion
22/12/2010Domestic PrecinctDomestic PrecinctGranted16/03/2011Approved22/03/2011Complete
SGS Australia
SGS - Airconditioning Installation - Reid Road
29/11/2010Reid RoadH 24Granted15/02/2011In Progress
WAC - T1 Inbound
T1 Inbound Processing Refurbishment $ Expansion - Extensions & Expansion to Grd Floor Arrivals Hall, 1st Floor Arrivals Corridor & 2nd Floor Depture Lounge & Stairwell
4/11/2010Terminal 1K12Granted19/12/2010Approved3/01/2011Complete
WAC
Terminal 3 - Installation of Split System AC in IT & Electrical Services Rooms
24/10/2010Terminal 3F9Granted4/11/2010Approved7/11/2010Complete
Airflite Pty Ltd
26 Newton Rd - Construction of New Hangar, Workshop, Offices and Apron Development
24/10/201026 Newton RdH4In Progress
BP Australia Pty Ltd - AirBP Perth JUHI Depot
Security Upgrade & Installation of Hot Works Workshop & Diesel Additive storage shed
5/10/2010International PrecinctJ15Granted16/11/2010Approved17/11/2010Complete